Project management

Which work platform helps our teams deliver reliably at the level of coordination we need?

Planning, collaboration, automation, and portfolio visibility for teams.

Research desk Β· Oct 20, 2026 Β· Methodology

YOUR SHORTLIST STARTS HERE

Compare the options.

Highest documented score first. Fit adds up the 28 feature checks below, including AI, across documented plans. Entry price does not include every capability. Unknown evidence appears as a range.

Product / good fit forPricing contextDocumented fitNext step

Asana

Cross-functional teams linking projects to goals and capacity.

$10.99per user/month, annual billing Β· billed annuallyStarter
83–100/100 documented fit
83% evidence coverage
Full research β†’

Wrike

Teams with formal delivery processes and resource or portfolio oversight.

$25.00per user/month, annual billing Β· billed annuallyBusiness
74–100/100 documented fit
74% evidence coverage
Full research β†’

ClickUp

Teams consolidating several collaboration tools into one workspace.

$7.00per user/month, annual billing Β· billed annuallyUnlimited
72–100/100 documented fit
72% evidence coverage
Full research β†’

Smartsheet

Operations and program teams comfortable with structured sheets and reports.

$9.00per member/month, annual billing Β· billed annuallyPro
67–100/100 documented fit
67% evidence coverage
Full research β†’

monday work management

Operations teams that want to design workflows around structured boards.

See pricingseats plus AI creditsWork platform
66–100/100 documented fit
66% evidence coverage
Full research β†’

Notion

Teams organizing project context, knowledge, and lightweight workflows together.

See pricingper member/month plus optional creditsBusiness for broad AI
61–100/100 documented fit
61% evidence coverage
Full research β†’
Flowlu

Flowlu

Service businesses managing the journey from sales to project delivery.

$9.00user/month Β· billed annuallyEssential
60–100/100 documented fit
60% evidence coverage
Full research β†’
Nifty

Nifty

Agencies coordinating project delivery, clients and internal discussion in one workspace.

$10.00member/month Β· billed annuallyPro per-member
57–100/100 documented fit
57% evidence coverage
Full research β†’
Plaky

Plaky

Teams replacing shared spreadsheets with structured boards and approvals by convention.

$3.99seat/month Β· billed annuallyPro
36–100/100 documented fit
36% evidence coverage
Full research β†’
SuiteDash

SuiteDash

Service firms wanting client portals, sales and delivery in one workspace.

$19.00workspace/monthStart
36–95/100 documented fit
41% evidence coverage
Full research β†’
Nozbe

Nozbe

Small teams coordinating recurring work and external project collaborators.

See pricingmember/monthPremium
18–100/100 documented fit
18% evidence coverage
Full research β†’

BEYOND A FEATURE CHECKMARK

How deep does the capability go?

Choose up to 3 for a closer look β†’

28 weighted checks: core capabilities contribute 32 points and workflow depth contributes 68. AI is included at the weight shown for this category. Expand Evidence for scope and sources, or ask for the same demonstration from each supplier.

Showing fewer rows does not change the score.
Project management features for all 11 products
Feature / base weightAsana
83–100/100 documented fit
Core capabilities24.8–32 / 32 pts8/10 checks with established status
Workflow depth58–68 / 68 pts14/18 checks with established status
Wrike
74–100/100 documented fit
Core capabilities25.6–32 / 32 pts8/10 checks with established status
Workflow depth48–68 / 68 pts10/18 checks with established status
ClickUp
72–100/100 documented fit
Core capabilities28.8–32 / 32 pts9/10 checks with established status
Workflow depth43.2–68 / 68 pts9/18 checks with established status
Smartsheet
67–100/100 documented fit
Core capabilities22.4–32 / 32 pts7/10 checks with established status
Workflow depth44.8–68 / 68 pts9/18 checks with established status
monday work management
66–100/100 documented fit
Core capabilities28.8–32 / 32 pts9/10 checks with established status
Workflow depth37.6–68 / 68 pts8/18 checks with established status
Notion
61–100/100 documented fit
Core capabilities27.2–32 / 32 pts8/10 checks with established status
Workflow depth33.6–68 / 68 pts7/18 checks with established status
Flowlu
60–100/100 documented fit
Core capabilities29.6–32 / 32 pts9/10 checks with established status
Workflow depth30.4–68 / 68 pts6/18 checks with established status
Nifty
57–100/100 documented fit
Core capabilities29.6–32 / 32 pts9/10 checks with established status
Workflow depth27.2–68 / 68 pts6/18 checks with established status
Plaky
36–100/100 documented fit
Core capabilities24.8–32 / 32 pts7/10 checks with established status
Workflow depth11.2–68 / 68 pts2/18 checks with established status
SuiteDash
36–95/100 documented fit
Core capabilities19.6–30 / 32 pts6/10 checks with established status
Workflow depth16.4–65.2 / 68 pts4/18 checks with established status
Nozbe
18–100/100 documented fit
Core capabilities12–32 / 32 pts3/10 checks with established status
Workflow depth6.4–68 / 68 pts1/18 checks with established status
Core capabilityTasks and structured work4 points Β· Organize project tasks or work items in a plan.Supported4 / 4 pts
Evidence

Project tasks are organized in shared plans.

Official documentation Β· Oct 15, 2026Source
Supported4 / 4 pts
Evidence

Projects and configured workflows organize work.

Official documentation Β· Oct 15, 2026Source
Supported4 / 4 pts
Evidence

Tasks and custom fields organize project work.

Official documentation Β· Oct 15, 2026Source
Supported4 / 4 pts
Evidence

Table and board views organize work.

Official documentation Β· Oct 15, 2026Source
Supported4 / 4 pts
Evidence

Boards organize work items.

Official documentation Β· Oct 15, 2026Source
Supported4 / 4 pts
Evidence

Database tasks and subtasks are documented.

Official documentation Β· Oct 15, 2026Source
Supported4 / 4 pts
Evidence

Project tasks and ownership.

Official documentation Β· Oct 20, 2026Source
Supported4 / 4 pts
Evidence

Tasks, subtasks and milestones.

Official documentation Β· Oct 20, 2026Source
Supported4 / 4 pts
Evidence

Owners, due dates and custom fields.

Official documentation Β· Oct 20, 2026Source
Supported4 / 4 pts
Evidence

Tasks, phases and templates.

Official documentation Β· Oct 20, 2026Source
Supported4 / 4 pts
Evidence

Tasks include owner and due date.

Official documentation Β· Oct 20, 2026Source
Core capabilityTimeline or dependency planning4 points Β· Plan dates or dependencies in timeline, Gantt or dependency views.Supported4 / 4 pts
Evidence

Timeline, Gantt and dependencies are explicitly documented.

Official documentation Β· Oct 15, 2026Source
Not verified0–4 / 4 pts
Evidence

The reviewed documentation does not establish timeline or dependency planning at this feature level. This is an evidence gap, not a finding that the capability is absent.

Not verified Β· Oct 15, 2026Source
Supported4 / 4 pts
Evidence

Gantt planning is documented.

Official documentation Β· Oct 15, 2026Source
Supported4 / 4 pts
Evidence

Gantt and calendar planning are documented.

Official documentation Β· Oct 15, 2026Source
Supported4 / 4 pts
Evidence

Timeline and Gantt views are documented.

Official documentation Β· Oct 15, 2026Source
Supported4 / 4 pts
Evidence

Task dependencies are documented.

Official documentation Β· Oct 15, 2026Source
Supported4 / 4 pts
Evidence

Dependencies and automatic scheduling.

Official documentation Β· Oct 20, 2026Source
Supported4 / 4 pts
Evidence

Linked tasks and milestones.

Official documentation Β· Oct 20, 2026Source
Supported4 / 4 pts
Evidence

Gantt dates and timeline; dependency cascade remains unverified.

Official documentation Β· Oct 20, 2026Source
Limited2 / 4 pts
Evidence

Pinnacle; excludes Super Admin tasks.

Official documentation Β· Oct 20, 2026Source
Not verified0–4 / 4 pts
Evidence

Not established in the reviewed documentation.

Not verified Β· Oct 20, 2026Source
Depth checkDependency-aware rescheduling5.6 points Β· Move linked task dates or identify downstream impact when a predecessor changes.
Ask for a demonstration

Delay a predecessor and show which dependent dates or warnings change.

A scenario to run with the supplier; not a completed product test.
Supported5.6 / 5.6 pts
Evidence

Dependency preferences shift connected task dates and preview changes; dates and dependency relationships must be configured.

Official documentation Β· Oct 15, 2026Source
Supported5.6 / 5.6 pts
Evidence

Dependent tasks reschedule with predecessors; approvals record approve/change-request decisions in the work review flow.

Official documentation Β· Oct 15, 2026Source
Supported5.6 / 5.6 pts
Evidence

The Reschedule Dependencies ClickApp automatically moves tasks linked by dependency relationships.

Official documentation Β· Oct 15, 2026Source
Supported5.6 / 5.6 pts
Evidence

With dependencies enabled, changing a predecessor's dates recalculates dependent task dates.

Official documentation Β· Oct 15, 2026Source
Supported5.6 / 5.6 pts
Evidence

Gantt dependencies adjust downstream tasks after a schedule change when the dependency configuration is enabled.

Official documentation Β· Oct 15, 2026Source
Supported5.6 / 5.6 pts
Evidence

Dependency settings can shift connected task dates while maintaining the gap between tasks.

Official documentation Β· Oct 15, 2026Source
Supported5.6 / 5.6 pts
Evidence

Dependencies and automatic scheduling.

Official documentation Β· Oct 20, 2026Source
Supported5.6 / 5.6 pts
Evidence

Cascade downstream dates.

Official documentation Β· Oct 20, 2026Source
Not verified0–5.6 / 5.6 pts
Evidence

Not established in the reviewed documentation.

Not verified Β· Oct 20, 2026Source
Limited2.8 / 5.6 pts
Evidence

Linked dates; Super Admin excluded.

Official documentation Β· Oct 20, 2026Source
Not verified0–5.6 / 5.6 pts
Evidence

Not established in the reviewed documentation.

Not verified Β· Oct 20, 2026Source
Depth checkBaseline or planned-versus-actual tracking6.4 points Β· Compare a saved or planned schedule with current progress or actual dates.
Ask for a demonstration

Save a plan, change delivery dates and show the variance from the original plan.

A scenario to run with the supplier; not a completed product test.
Supported6.4 / 6.4 pts
Evidence

Gantt view supports a dated project baseline for comparing the current schedule with its earlier state.

Official documentation Β· Oct 15, 2026Source
Supported6.4 / 6.4 pts
Evidence

Wrike's January 2026 release documents Gantt snapshots and baselines for comparing schedule states.

Official documentation Β· Oct 15, 2026Source
Supported6.4 / 6.4 pts
Evidence

Gantt baselines save start/end-date snapshots and compare current task dates against the saved plan.

Official documentation Β· Oct 15, 2026Source
Supported6.4 / 6.4 pts
Evidence

Baselines preserve planned start and finish dates and expose variance against the current schedule.

Official documentation Β· Oct 15, 2026Source
Supported6.4 / 6.4 pts
Evidence

Gantt snapshots compare current dates with a saved baseline; Pro or Enterprise applies.

Official documentation Β· Oct 15, 2026Source
Not verified0–6.4 / 6.4 pts
Evidence

The reviewed evidence does not establish this advanced behavior: baseline or planned-versus-actual tracking. Request the demonstration above; absence of public evidence does not establish absence of the feature.

Not verified Β· Oct 15, 2026Source
Supported6.4 / 6.4 pts
Evidence

Advanced project baseline comparison.

Official documentation Β· Oct 20, 2026Source
Not verified0–6.4 / 6.4 pts
Evidence

Not established in the reviewed documentation.

Not verified Β· Oct 20, 2026Source
Not verified0–6.4 / 6.4 pts
Evidence

Not established in the reviewed documentation.

Not verified Β· Oct 20, 2026Source
Not verified0–6.4 / 6.4 pts
Evidence

Not established by reviewed sources.

Not verified Β· Oct 20, 2026Source
Not verified0–6.4 / 6.4 pts
Evidence

Not established in the reviewed documentation.

Not verified Β· Oct 20, 2026Source
Core capabilityDiscussion attached to work4 points Β· Discuss work through comments, updates or project chat.Supported4 / 4 pts
Evidence

Comments are attached to shared project work.

Official documentation Β· Oct 15, 2026Source
Supported4 / 4 pts
Evidence

Shared work supports team collaboration.

Official documentation Β· Oct 15, 2026Source
Supported4 / 4 pts
Evidence

Chat and work collaboration are documented.

Official documentation Β· Oct 15, 2026Source
Not verified0–4 / 4 pts
Evidence

The reviewed documentation does not establish discussion attached to work at this feature level. This is an evidence gap, not a finding that the capability is absent.

Not verified Β· Oct 15, 2026Source
Supported4 / 4 pts
Evidence

Work updates and guest participation are supported.

Official documentation Β· Oct 15, 2026Source
Supported4 / 4 pts
Evidence

Comments support collaboration.

Official documentation Β· Oct 15, 2026Source
Supported4 / 4 pts
Evidence

Shared files and comments.

Official documentation Β· Oct 20, 2026Source
Supported4 / 4 pts
Evidence

Threaded project conversations.

Official documentation Β· Oct 20, 2026Source
Supported4 / 4 pts
Evidence

Task comments.

Official documentation Β· Oct 20, 2026Source
Supported4 / 4 pts
Evidence

Separate client/team discussions.

Official documentation Β· Oct 20, 2026Source
Supported4 / 4 pts
Evidence

Comments stay with the task.

Official documentation Β· Oct 20, 2026Source
Core capabilityShared documents or review4 points Β· Collaborate on documents, attachments or reviewable work within a project.Not verified0–4 / 4 pts
Evidence

The reviewed documentation does not establish shared documents or review at this feature level. This is an evidence gap, not a finding that the capability is absent.

Not verified Β· Oct 15, 2026Source
Supported4 / 4 pts
Evidence

Review workflows support collaboration on deliverables.

Official documentation Β· Oct 15, 2026Source
Supported4 / 4 pts
Evidence

Shared docs are documented.

Official documentation Β· Oct 15, 2026Source
Supported4 / 4 pts
Evidence

Contributors can collaborate using shared reports.

Official documentation Β· Oct 15, 2026Source
Supported4 / 4 pts
Evidence

Collaborative docs are documented.

Official documentation Β· Oct 15, 2026Source
Supported4 / 4 pts
Evidence

Collaborative documents are documented.

Official documentation Β· Oct 15, 2026Source
Supported4 / 4 pts
Evidence

Shared files and comments.

Official documentation Β· Oct 20, 2026Source
Supported4 / 4 pts
Evidence

Documents and file attachments.

Official documentation Β· Oct 20, 2026Source
Supported4 / 4 pts
Evidence

Task file attachments.

Official documentation Β· Oct 20, 2026Source
Supported4 / 4 pts
Evidence

Shared files.

Official documentation Β· Oct 20, 2026Source
Supported4 / 4 pts
Evidence

Attach files to task comments.

Official documentation Β· Oct 20, 2026Source
Depth checkWork or document version history5.6 points Β· Inspect prior task/document values or restore an earlier version.
Ask for a demonstration

Change shared project content and show the previous version and restoration options.

A scenario to run with the supplier; not a completed product test.
Supported5.6 / 5.6 pts
Evidence

Task activity history records description, assignee, due-date and other changes. This establishes history inspection, not universal restoration.

Official documentation Β· Oct 15, 2026Source
Supported5.6 / 5.6 pts
Evidence

Description version history lets users inspect prior versions and restore selected content.

Official documentation Β· Oct 15, 2026Source
Supported5.6 / 5.6 pts
Evidence

Doc/item permissions explicitly scope guest access; authorized viewers can inspect Doc history.

Official documentation Β· Oct 15, 2026Source
Supported5.6 / 5.6 pts
Evidence

Cell history records previous values, editors and times. The activity log provides broader sheet activity on supported plans.

Official documentation Β· Oct 15, 2026Source
Not verified0–5.6 / 5.6 pts
Evidence

The reviewed evidence does not establish this advanced behavior: work or document version history. Request the demonstration above; absence of public evidence does not establish absence of the feature.

Not verified Β· Oct 15, 2026Source
Supported5.6 / 5.6 pts
Evidence

Page version history supports inspection and restoration; retention ranges from seven days to unlimited depending on plan.

Official documentation Β· Oct 15, 2026Source
Not verified0–5.6 / 5.6 pts
Evidence

Not established by reviewed sources.

Not verified Β· Oct 20, 2026Source
Not verified0–5.6 / 5.6 pts
Evidence

Not established in the reviewed documentation.

Not verified Β· Oct 20, 2026Source
Not verified0–5.6 / 5.6 pts
Evidence

Not established in the reviewed documentation.

Not verified Β· Oct 20, 2026Source
Not verified0–5.6 / 5.6 pts
Evidence

Not established by reviewed sources.

Not verified Β· Oct 20, 2026Source
Not verified0–5.6 / 5.6 pts
Evidence

Recurring snapshots; general version restoration unverified.

Not verified Β· Oct 20, 2026Source
Depth checkScoped external-collaborator access6.4 points Β· Limit an external collaborator to selected work while protecting unrelated project information.
Ask for a demonstration

Invite a test guest to one project and show that another project remains inaccessible.

A scenario to run with the supplier; not a completed product test.
Supported6.4 / 6.4 pts
Evidence

Team and project sharing scopes visibility; limited-access collaborators cannot access unrelated unshared team work.

Official documentation Β· Oct 15, 2026Source
Supported6.4 / 6.4 pts
Evidence

Guest reviewers see only files assigned for approval, with controls for download, internal comments and access expiry; they cannot browse other project data.

Official documentation Β· Oct 15, 2026Source
Supported6.4 / 6.4 pts
Evidence

Doc/item permissions explicitly scope guest access; authorized viewers can inspect Doc history.

Official documentation Β· Oct 15, 2026Source
Supported6.4 / 6.4 pts
Evidence

Sharing permissions apply to specific sheets, reports and workspaces, with viewer, commenter, editor and administrator roles.

Official documentation Β· Oct 15, 2026Source
Supported6.4 / 6.4 pts
Evidence

Board types and permissions control access to shared work; account policies cap workspace and board permissions.

Official documentation Β· Oct 15, 2026Source
Supported6.4 / 6.4 pts
Evidence

Guests are invited to individual pages, rather than becoming workspace members. Page-sharing permissions govern the content they can access.

Official documentation Β· Oct 15, 2026Source
Supported6.4 / 6.4 pts
Evidence

Field/action-scoped guest roles.

Official documentation Β· Oct 20, 2026Source
Supported6.4 / 6.4 pts
Evidence

Guests excluded from uninvited projects.

Official documentation Β· Oct 20, 2026Source
Supported6.4 / 6.4 pts
Evidence

Private boards and limited editing.

Official documentation Β· Oct 20, 2026Source
Supported6.4 / 6.4 pts
Evidence

Separate client/team discussions.

Official documentation Β· Oct 20, 2026Source
Supported6.4 / 6.4 pts
Evidence

Project-only guest access; editing restricted.

Official documentation Β· Oct 20, 2026Source
Core capabilityTriggered workflow automation3.2 points Β· Run configured steps when a task or project event occurs.Supported3.2 / 3.2 pts
Evidence

Rules and workflow builder automate steps.

Official documentation Β· Oct 15, 2026Source
Supported3.2 / 3.2 pts
Evidence

Configurable workflow automation is documented.

Official documentation Β· Oct 15, 2026Source
Supported3.2 / 3.2 pts
Evidence

Workflow automation has plan-specific allowances.

Official documentation Β· Oct 15, 2026Source
Supported3.2 / 3.2 pts
Evidence

Pro includes 250 automations per month.

Official documentation Β· Oct 15, 2026Source
Supported3.2 / 3.2 pts
Evidence

Automations consume plan-specific action allowances.

Official documentation Β· Oct 15, 2026Source
Supported3.2 / 3.2 pts
Evidence

Database automations and Custom Agents have paid-plan boundaries.

Official documentation Β· Oct 15, 2026Source
Supported3.2 / 3.2 pts
Evidence

Conditional and delayed automation.

Official documentation Β· Oct 20, 2026Source
Supported3.2 / 3.2 pts
Evidence

Event-based rule builder.

Official documentation Β· Oct 20, 2026Source
Supported3.2 / 3.2 pts
Evidence

Board event triggers.

Official documentation Β· Oct 20, 2026Source
Supported3.2 / 3.2 pts
Evidence

Won deal creates delivery.

Official documentation Β· Oct 20, 2026Source
Not verified0–3.2 / 3.2 pts
Evidence

Not established in the reviewed documentation.

Not verified Β· Oct 20, 2026Source
Core capabilityAutomated routing or approvals3.2 points Β· Automatically route work, assign it or initiate a review/approval.Not verified0–3.2 / 3.2 pts
Evidence

The reviewed documentation does not establish automated routing or approvals at this feature level. This is an evidence gap, not a finding that the capability is absent.

Not verified Β· Oct 15, 2026Source
Supported3.2 / 3.2 pts
Evidence

Agents can route work and initiate approvals.

Official documentation Β· Oct 15, 2026Source
Not verified0–3.2 / 3.2 pts
Evidence

The reviewed documentation does not establish automated routing or approvals at this feature level. This is an evidence gap, not a finding that the capability is absent.

Not verified Β· Oct 15, 2026Source
Not verified0–3.2 / 3.2 pts
Evidence

The reviewed documentation does not establish automated routing or approvals at this feature level. This is an evidence gap, not a finding that the capability is absent.

Not verified Β· Oct 15, 2026Source
Not verified0–3.2 / 3.2 pts
Evidence

The reviewed documentation does not establish automated routing or approvals at this feature level. This is an evidence gap, not a finding that the capability is absent.

Not verified Β· Oct 15, 2026Source
Supported3.2 / 3.2 pts
Evidence

Custom Agents can route tasks, with Business/Enterprise and credit requirements.

Official documentation Β· Oct 15, 2026Source
Supported3.2 / 3.2 pts
Evidence

Task-owner approval stage.

Official documentation Β· Oct 20, 2026Source
Supported3.2 / 3.2 pts
Evidence

Rule actions assign work and change status.

Official documentation Β· Oct 20, 2026Source
Supported3.2 / 3.2 pts
Evidence

Automations assign work and update status.

Official documentation Β· Oct 20, 2026Source
Not verified0–3.2 / 3.2 pts
Evidence

Not established by reviewed sources.

Not verified Β· Oct 20, 2026Source
Not verified0–3.2 / 3.2 pts
Evidence

Not established in the reviewed documentation.

Not verified Β· Oct 20, 2026Source
Depth checkMultiple-condition workflow rules4.8 points Β· Combine conditions before a workflow changes or routes work.
Ask for a demonstration

Create a rule for an overdue high-priority item and show that a low-priority item does not trigger it.

A scenario to run with the supplier; not a completed product test.
Supported4.8 / 4.8 pts
Evidence

Rules support multiple conditions and ordered branches for different actions.

Official documentation Β· Oct 15, 2026Source
Supported4.8 / 4.8 pts
Evidence

Automation condition filters combine status, assignee, effort and custom-field requirements before actions run.

Official documentation Β· Oct 15, 2026Source
Supported4.8 / 4.8 pts
Evidence

Automations support multiple conditions within a trigger/action rule; action allowances and plan limits apply.

Official documentation Β· Oct 15, 2026Source
Supported4.8 / 4.8 pts
Evidence

Workflow condition blocks support multiple filters and branching paths to control which rows cause subsequent actions.

Official documentation Β· Oct 15, 2026Source
Supported4.8 / 4.8 pts
Evidence

Workflows support If/Else and multiple conditional branches before actions execute.

Official documentation Β· Oct 15, 2026Source
Supported4.8 / 4.8 pts
Evidence

Database automations support multiple triggers, all/any conditions and actions on matching pages. An automation cannot trigger another automation; some edit triggers use a short matching window.

Official documentation Β· Oct 15, 2026Source
Supported4.8 / 4.8 pts
Evidence

Conditional and delayed automation.

Official documentation Β· Oct 20, 2026Source
Supported4.8 / 4.8 pts
Evidence

Multiple rule conditions and actions.

Official documentation Β· Oct 20, 2026Source
Supported4.8 / 4.8 pts
Evidence

Multiple conditions per automation.

Official documentation Β· Oct 20, 2026Source
Not verified0–4.8 / 4.8 pts
Evidence

Not established by reviewed sources.

Not verified Β· Oct 20, 2026Source
Not verified0–4.8 / 4.8 pts
Evidence

Not established in the reviewed documentation.

Not verified Β· Oct 20, 2026Source
Depth checkApproval outcomes in the workflow4.8 points Β· Capture approval/rejection or requested changes and use that result to advance or reroute work.
Ask for a demonstration

Reject an approval request and show the item returning to its owner with the decision recorded.

A scenario to run with the supplier; not a completed product test.
Supported4.8 / 4.8 pts
Evidence

Approval tasks record formal decisions and rules can continue the workflow on approval.

Official documentation Β· Oct 15, 2026Source
Supported4.8 / 4.8 pts
Evidence

Dependent tasks reschedule with predecessors; approvals record approve/change-request decisions in the work review flow.

Official documentation Β· Oct 15, 2026Source
Not verified0–4.8 / 4.8 pts
Evidence

The reviewed evidence does not establish this advanced behavior: approval outcomes in the workflow. Request the demonstration above; absence of public evidence does not establish absence of the feature.

Not verified Β· Oct 15, 2026Source
Supported4.8 / 4.8 pts
Evidence

Approval requests pause workflows for an approve/decline decision. Subsequent conditions can act on the recorded approval status.

Official documentation Β· Oct 15, 2026Source
Not verified0–4.8 / 4.8 pts
Evidence

The reviewed evidence does not establish this advanced behavior: approval outcomes in the workflow. Request the demonstration above; absence of public evidence does not establish absence of the feature.

Not verified Β· Oct 15, 2026Source
Not verified0–4.8 / 4.8 pts
Evidence

The reviewed evidence does not establish this advanced behavior: approval outcomes in the workflow. Request the demonstration above; absence of public evidence does not establish absence of the feature.

Not verified Β· Oct 15, 2026Source
Not verified0–4.8 / 4.8 pts
Evidence

Not established by reviewed sources.

Not verified Β· Oct 20, 2026Source
Not verified0–4.8 / 4.8 pts
Evidence

Not established in the reviewed documentation.

Not verified Β· Oct 20, 2026Source
Not verified0–4.8 / 4.8 pts
Evidence

Not established in the reviewed documentation.

Not verified Β· Oct 20, 2026Source
Not verified0–4.8 / 4.8 pts
Evidence

Not established by reviewed sources.

Not verified Β· Oct 20, 2026Source
Not verified0–4.8 / 4.8 pts
Evidence

Not established in the reviewed documentation.

Not verified Β· Oct 20, 2026Source
Core capabilityCross-project portfolio visibility2.4 points Β· See or report across multiple projects in one view.Supported2.4 / 2.4 pts
Evidence

Portfolios require a higher tier.

Official documentation Β· Oct 15, 2026Source
Supported2.4 / 2.4 pts
Evidence

Portfolio features require advanced tiers.

Official documentation Β· Oct 15, 2026Source
Supported2.4 / 2.4 pts
Evidence

Portfolio scope depends on tier.

Official documentation Β· Oct 15, 2026Source
Supported2.4 / 2.4 pts
Evidence

Portfolio features require Enterprise+.

Official documentation Β· Oct 15, 2026Source
Supported2.4 / 2.4 pts
Evidence

Cross-board reporting varies by tier.

Official documentation Β· Oct 15, 2026Source
Not verified0–2.4 / 2.4 pts
Evidence

The reviewed documentation does not establish cross-project portfolio visibility at this feature level. This is an evidence gap, not a finding that the capability is absent.

Not verified Β· Oct 15, 2026Source
Supported2.4 / 2.4 pts
Evidence

Advanced portfolio.

Official documentation Β· Oct 20, 2026Source
Supported2.4 / 2.4 pts
Evidence

Portfolio/overview access documented.

Official documentation Β· Oct 20, 2026Source
Supported2.4 / 2.4 pts
Evidence

Paid multi-board dashboards.

Official documentation Β· Oct 20, 2026Source
Not verified0–2.4 / 2.4 pts
Evidence

Not established by reviewed sources.

Not verified Β· Oct 20, 2026Source
Not verified0–2.4 / 2.4 pts
Evidence

Not established in the reviewed documentation.

Not verified Β· Oct 20, 2026Source
Core capabilityResource or workload planning2.4 points Β· Review or allocate team capacity across work.Supported2.4 / 2.4 pts
Evidence

Resource/workload features require a higher tier.

Official documentation Β· Oct 15, 2026Source
Supported2.4 / 2.4 pts
Evidence

Advanced resource planning is tier-dependent.

Official documentation Β· Oct 15, 2026Source
Supported2.4 / 2.4 pts
Evidence

Workload scope depends on tier.

Official documentation Β· Oct 15, 2026Source
Not verified0–2.4 / 2.4 pts
Evidence

The reviewed documentation does not establish resource or workload planning at this feature level. This is an evidence gap, not a finding that the capability is absent.

Not verified Β· Oct 15, 2026Source
Supported2.4 / 2.4 pts
Evidence

Capacity features vary by tier.

Official documentation Β· Oct 15, 2026Source
Not verified0–2.4 / 2.4 pts
Evidence

The reviewed documentation does not establish resource or workload planning at this feature level. This is an evidence gap, not a finding that the capability is absent.

Not verified Β· Oct 15, 2026Source
Not verified0–2.4 / 2.4 pts
Evidence

Not established by reviewed sources.

Not verified Β· Oct 20, 2026Source
Supported2.4 / 2.4 pts
Evidence

Available hours versus assigned effort.

Official documentation Β· Oct 20, 2026Source
Not verified0–2.4 / 2.4 pts
Evidence

Not established in the reviewed documentation.

Not verified Β· Oct 20, 2026Source
Not verified0–2.4 / 2.4 pts
Evidence

Not established by reviewed sources.

Not verified Β· Oct 20, 2026Source
Not verified0–2.4 / 2.4 pts
Evidence

Not established in the reviewed documentation.

Not verified Β· Oct 20, 2026Source
Depth checkCapacity and overload visibility3.2 points Β· Compare allocated work with individual or team capacity and identify overload.
Ask for a demonstration

Over-allocate a person across two projects and show where the conflict appears.

A scenario to run with the supplier; not a completed product test.
Supported3.2 / 3.2 pts
Evidence

Advanced portfolios track cross-project status/timelines and workload displays team bandwidth for rebalancing.

Official documentation Β· Oct 15, 2026Source
Supported3.2 / 3.2 pts
Evidence

Professional Services supports task-to-project custom-field rollups and workload charts across projects, with overload visibility and redistribution of assigned effort.

Official documentation Β· Oct 15, 2026Source
Supported3.2 / 3.2 pts
Evidence

Workload view compares assigned effort against per-person capacity and highlights under/over-allocation.

Official documentation Β· Oct 15, 2026Source
Supported3.2 / 3.2 pts
Evidence

Workload tracking displays allocation across enabled projects and highlights over-capacity assignments. Availability depends on the plan and resource configuration.

Official documentation Β· Oct 15, 2026Source
Supported3.2 / 3.2 pts
Evidence

Workload compares assigned effort with working schedules or custom capacity and highlights overload across connected boards. Available on Pro and Enterprise.

Official documentation Β· Oct 15, 2026Source
Not verified0–3.2 / 3.2 pts
Evidence

The reviewed evidence does not establish this advanced behavior: capacity and overload visibility. Request the demonstration above; absence of public evidence does not establish absence of the feature.

Not verified Β· Oct 15, 2026Source
Not verified0–3.2 / 3.2 pts
Evidence

Not established by reviewed sources.

Not verified Β· Oct 20, 2026Source
Supported3.2 / 3.2 pts
Evidence

Overload indicators and reassignment.

Official documentation Β· Oct 20, 2026Source
Not verified0–3.2 / 3.2 pts
Evidence

Not established in the reviewed documentation.

Not verified Β· Oct 20, 2026Source
Not verified0–3.2 / 3.2 pts
Evidence

Not established by reviewed sources.

Not verified Β· Oct 20, 2026Source
Not verified0–3.2 / 3.2 pts
Evidence

Not established in the reviewed documentation.

Not verified Β· Oct 20, 2026Source
Depth checkPortfolio progress or metric rollups4 points Β· Aggregate progress, dates or configured measures from multiple projects into a portfolio report.
Ask for a demonstration

Change a project measure and show the corresponding portfolio total or status update.

A scenario to run with the supplier; not a completed product test.
Supported4 / 4 pts
Evidence

Advanced portfolios track cross-project status/timelines and workload displays team bandwidth for rebalancing.

Official documentation Β· Oct 15, 2026Source
Supported4 / 4 pts
Evidence

Professional Services supports task-to-project custom-field rollups and workload charts across projects, with overload visibility and redistribution of assigned effort.

Official documentation Β· Oct 15, 2026Source
Supported4 / 4 pts
Evidence

Portfolio cards aggregate progress across selected Folders and Lists and respect viewers' item access.

Official documentation Β· Oct 15, 2026Source
Supported4 / 4 pts
Evidence

Portfolio reports aggregate project information across portfolios and Control Center programs.

Official documentation Β· Oct 15, 2026Source
Supported4 / 4 pts
Evidence

Enterprise project boards connect to portfolios for multi-project progress and health review.

Official documentation Β· Oct 15, 2026Source
Supported4 / 4 pts
Evidence

Relations and rollups aggregate properties from related database pages; teams can configure a project database to summarize linked tasks.

Official documentation Β· Oct 15, 2026Source
Not verified0–4 / 4 pts
Evidence

Not established by reviewed sources.

Not verified Β· Oct 20, 2026Source
Not verified0–4 / 4 pts
Evidence

Not established in the reviewed documentation.

Not verified Β· Oct 20, 2026Source
Not verified0–4 / 4 pts
Evidence

Dashboard aggregate views; drill-through evidence incomplete.

Not verified Β· Oct 20, 2026Source
Not verified0–4 / 4 pts
Evidence

Not established by reviewed sources.

Not verified Β· Oct 20, 2026Source
Not verified0–4 / 4 pts
Evidence

Not established in the reviewed documentation.

Not verified Β· Oct 20, 2026Source
Core capabilityAI work summaries or content2.4 points Β· Generate or summarize content using work or project context.Supported2.4 / 2.4 pts
Evidence

AI generates summaries of work.

Official documentation Β· Oct 15, 2026Source
Not verified0–2.4 / 2.4 pts
Evidence

The reviewed documentation does not establish ai work summaries or content at this feature level. This is an evidence gap, not a finding that the capability is absent.

Not verified Β· Oct 15, 2026Source
Supported2.4 / 2.4 pts
Evidence

Brain supports writing and work summaries.

Official documentation Β· Oct 15, 2026Source
Supported2.4 / 2.4 pts
Evidence

Smart Assist explains sheets and supports conversational work.

Official documentation Β· Oct 15, 2026Source
Supported2.4 / 2.4 pts
Evidence

Sidekick provides work assistance and AI content classification.

Official documentation Β· Oct 15, 2026Source
Supported2.4 / 2.4 pts
Evidence

Notion AI can answer knowledge questions and prepare recurring status reports.

Official documentation Β· Oct 15, 2026Source
Supported2.4 / 2.4 pts
Evidence

Zoom meeting summaries; external integration.

Official documentation Β· Oct 20, 2026Source
Not verified0–2.4 / 2.4 pts
Evidence

Not established in the reviewed documentation.

Not verified Β· Oct 20, 2026Source
Not verified0–2.4 / 2.4 pts
Evidence

Not established in the reviewed documentation.

Not verified Β· Oct 20, 2026Source
Not verified0–2.4 / 2.4 pts
Evidence

Not established by reviewed sources.

Not verified Β· Oct 20, 2026Source
Not verified0–2.4 / 2.4 pts
Evidence

Not established in the reviewed documentation.

Not verified Β· Oct 20, 2026Source
Core capabilityAI-driven work actions2.4 points Β· Use AI to classify, update, route or execute steps on work items.Supported2.4 / 2.4 pts
Evidence

AI Studio executes workflow steps within account credit allowances.

Official documentation Β· Oct 15, 2026Source
Supported2.4 / 2.4 pts
Evidence

AI agents classify, route and start approvals; Business/Pinnacle/Apex and administrator enablement apply.

Official documentation Β· Oct 15, 2026Source
Supported2.4 / 2.4 pts
Evidence

AI fields and agents use the selected AI package and credits.

Official documentation Β· Oct 15, 2026Source
Supported2.4 / 2.4 pts
Evidence

Smart Assist sheet updates and AI columns depend on the applicable plan and administrator settings.

Official documentation Β· Oct 15, 2026Source
Supported2.4 / 2.4 pts
Evidence

AI columns, agents and workflows use the shared credit model.

Official documentation Β· Oct 15, 2026Source
Supported2.4 / 2.4 pts
Evidence

Custom Agents run scheduled/triggered work with workspace credits and connected-tool limits.

Official documentation Β· Oct 15, 2026Source
Supported2.4 / 2.4 pts
Evidence

Read/write CRM and projects.

Official documentation Β· Oct 20, 2026Source
Supported2.4 / 2.4 pts
Evidence

Orbit converts discussion into assigned tasks.

Official documentation Β· Oct 20, 2026Source
Not verified0–2.4 / 2.4 pts
Evidence

Not established in the reviewed documentation.

Not verified Β· Oct 20, 2026Source
Supported2.4 / 2.4 pts
Evidence

Predefined action selection.

Official documentation Β· Oct 20, 2026Source
Not verified0–2.4 / 2.4 pts
Evidence

Not established in the reviewed documentation.

Not verified Β· Oct 20, 2026Source
Depth checkAI respects work-access boundaries3.2 points Β· Document that AI uses only work the requester or configured agent can access.
Ask for a demonstration

Ask AI about a restricted project as a guest and show the boundary.

A scenario to run with the supplier; not a completed product test.
Supported3.2 / 3.2 pts
Evidence

AI Teammates and Dash use the triggering user's connected-app access; the integration cannot see or do more than that user.

Official documentation Β· Oct 15, 2026Source
Supported3.2 / 3.2 pts
Evidence

AI agents run within configured locations and allowed actions, with per-action filters and administrator-controlled scope. Review these permissions before enabling an agent.

Official documentation Β· Oct 15, 2026Source
Supported3.2 / 3.2 pts
Evidence

Super Agents have configured access and toolsets; disabling the Docs toolset prevents document edits. Agent-shared private data can appear to people allowed to trigger the agent, so scope both agent access and sharing.

Official documentation Β· Oct 15, 2026Source
Not verified0–3.2 / 3.2 pts
Evidence

The reviewed evidence does not establish this advanced behavior: ai respects work-access boundaries. Request the demonstration above; absence of public evidence does not establish absence of the feature.

Not verified Β· Oct 15, 2026Source
Supported3.2 / 3.2 pts
Evidence

Agent configuration scopes access to selected boards and distinguishes read-only access from editing/adding records; agent availability depends on the platform product.

Official documentation Β· Oct 15, 2026Source
Supported3.2 / 3.2 pts
Evidence

Custom Agents operate on explicitly granted pages, databases and tools; owners review access and tool permissions before publishing. Agent sharing must be considered separately from source-page sharing.

Official documentation Β· Oct 15, 2026Source
Supported3.2 / 3.2 pts
Evidence

Uses API-key permissions.

Official documentation Β· Oct 20, 2026Source
Supported3.2 / 3.2 pts
Evidence

MCP respects user permissions and token scopes.

Official documentation Β· Oct 20, 2026Source
Not verified0–3.2 / 3.2 pts
Evidence

Not established in the reviewed documentation.

Not verified Β· Oct 20, 2026Source
Supported3.2 / 3.2 pts
Evidence

Allowed fields only.

Official documentation Β· Oct 20, 2026Source
Not verified0–3.2 / 3.2 pts
Evidence

Not established in the reviewed documentation.

Not verified Β· Oct 20, 2026Source
Depth checkReview or scope AI work-changing actions4 points Β· Require approval or explicitly configure which work-changing actions an AI assistant/agent may perform.
Ask for a demonstration

Ask AI to update a task and show the review step or configured action permissions.

A scenario to run with the supplier; not a completed product test.
Supported4 / 4 pts
Evidence

AI Teammates prepare or edit rules through the rule builder; a person reviews and publishes the changes.

Official documentation Β· Oct 15, 2026Source
Supported4 / 4 pts
Evidence

AI agents run within configured locations and allowed actions, with per-action filters and administrator-controlled scope. Review these permissions before enabling an agent.

Official documentation Β· Oct 15, 2026Source
Supported4 / 4 pts
Evidence

Super Agents have configured access and toolsets; disabling the Docs toolset prevents document edits. Agent-shared private data can appear to people allowed to trigger the agent, so scope both agent access and sharing.

Official documentation Β· Oct 15, 2026Source
Supported4 / 4 pts
Evidence

Generated formulas or text appear in an output preview; the user chooses the destination cells and applies the result. This is a review-and-apply workflow, not autonomous project editing.

Official documentation Β· Oct 15, 2026Source
Supported4 / 4 pts
Evidence

Agent configuration scopes access to selected boards and distinguishes read-only access from editing/adding records; agent availability depends on the platform product.

Official documentation Β· Oct 15, 2026Source
Supported4 / 4 pts
Evidence

Custom Agents operate on explicitly granted pages, databases and tools; owners review access and tool permissions before publishing. Agent sharing must be considered separately from source-page sharing.

Official documentation Β· Oct 15, 2026Source
Supported4 / 4 pts
Evidence

Write confirmation required.

Official documentation Β· Oct 20, 2026Source
Supported4 / 4 pts
Evidence

MCP defaults read-only; owner explicitly scopes permitted writes.

Official documentation Β· Oct 20, 2026Source
Not verified0–4 / 4 pts
Evidence

Not established in the reviewed documentation.

Not verified Β· Oct 20, 2026Source
Supported4 / 4 pts
Evidence

Optional Wingman approval.

Official documentation Β· Oct 20, 2026Source
Not verified0–4 / 4 pts
Evidence

Not established in the reviewed documentation.

Not verified Β· Oct 20, 2026Source
Depth checkKeep one task synchronised across multiple projects2.5 points Β· Demonstrate: Keep one task synchronised across multiple projects. State the plan, limits and behaviour on failure. Use two linked projects and an overdue task.
Ask for a demonstration

Demonstrate: Keep one task synchronised across multiple projects. State the plan, limits and behaviour on failure. Use two linked projects and an overdue task.

A scenario to run with the supplier; not a completed product test.
Supported2.5 / 2.5 pts
Evidence

One task stays synchronised across multiple projects. Documented for Personal, Starter, Advanced, Enterprise and Enterprise+. Global capability evidence; local plan availability and interface language are not inferred.

Official documentation Β· Oct 21, 2026Source
Not verified0–2.5 / 2.5 pts
Evidence

This specific check has not been verified. Missing evidence does not mean the capability is absent. Ask for a demonstration in the proposed plan.

Not verified Β· Oct 21, 2026Source
Not verified0–2.5 / 2.5 pts
Evidence

This specific check has not been verified. Missing evidence does not mean the capability is absent. Ask for a demonstration in the proposed plan.

Not verified Β· Oct 21, 2026Source
Not verified0–2.5 / 2.5 pts
Evidence

This specific check has not been verified. Missing evidence does not mean the capability is absent. Ask for a demonstration in the proposed plan.

Not verified Β· Oct 21, 2026Source
Not verified0–2.5 / 2.5 pts
Evidence

This specific check has not been verified. Missing evidence does not mean the capability is absent. Ask for a demonstration in the proposed plan.

Not verified Β· Oct 21, 2026Source
Not verified0–2.5 / 2.5 pts
Evidence

This specific check has not been verified. Missing evidence does not mean the capability is absent. Ask for a demonstration in the proposed plan.

Not verified Β· Oct 21, 2026Source
Not verified0–2.5 / 2.5 pts
Evidence

This specific check has not been verified. Missing evidence does not mean the capability is absent. Ask for a demonstration in the proposed plan.

Not verified Β· Oct 21, 2026Source
Not verified0–2.5 / 2.5 pts
Evidence

This specific check has not been verified. Missing evidence does not mean the capability is absent. Ask for a demonstration in the proposed plan.

Not verified Β· Oct 21, 2026Source
Not verified0–2.5 / 2.5 pts
Evidence

This specific check has not been verified. Missing evidence does not mean the capability is absent. Ask for a demonstration in the proposed plan.

Not verified Β· Oct 21, 2026Source
Not verified0–2.5 / 2.5 pts
Evidence

This specific check has not been verified. Missing evidence does not mean the capability is absent. Ask for a demonstration in the proposed plan.

Not verified Β· Oct 21, 2026Source
Not verified0–2.5 / 2.5 pts
Evidence

This specific check has not been verified. Missing evidence does not mean the capability is absent. Ask for a demonstration in the proposed plan.

Not verified Β· Oct 21, 2026Source
Depth checkIdentify the project's critical path2.5 points Β· Demonstrate: Identify the project's critical path. State the plan, limits and behaviour on failure. Use two linked projects and an overdue task.
Ask for a demonstration

Demonstrate: Identify the project's critical path. State the plan, limits and behaviour on failure. Use two linked projects and an overdue task.

A scenario to run with the supplier; not a completed product test.
Not verified0–2.5 / 2.5 pts
Evidence

This specific check has not been verified. Missing evidence does not mean the capability is absent. Ask for a demonstration in the proposed plan.

Not verified Β· Oct 21, 2026Source
Not verified0–2.5 / 2.5 pts
Evidence

This specific check has not been verified. Missing evidence does not mean the capability is absent. Ask for a demonstration in the proposed plan.

Not verified Β· Oct 21, 2026Source
Not verified0–2.5 / 2.5 pts
Evidence

This specific check has not been verified. Missing evidence does not mean the capability is absent. Ask for a demonstration in the proposed plan.

Not verified Β· Oct 21, 2026Source
Not verified0–2.5 / 2.5 pts
Evidence

This specific check has not been verified. Missing evidence does not mean the capability is absent. Ask for a demonstration in the proposed plan.

Not verified Β· Oct 21, 2026Source
Not verified0–2.5 / 2.5 pts
Evidence

This specific check has not been verified. Missing evidence does not mean the capability is absent. Ask for a demonstration in the proposed plan.

Not verified Β· Oct 21, 2026Source
Not verified0–2.5 / 2.5 pts
Evidence

This specific check has not been verified. Missing evidence does not mean the capability is absent. Ask for a demonstration in the proposed plan.

Not verified Β· Oct 21, 2026Source
Not verified0–2.5 / 2.5 pts
Evidence

This specific check has not been verified. Missing evidence does not mean the capability is absent. Ask for a demonstration in the proposed plan.

Not verified Β· Oct 21, 2026Source
Not verified0–2.5 / 2.5 pts
Evidence

This specific check has not been verified. Missing evidence does not mean the capability is absent. Ask for a demonstration in the proposed plan.

Not verified Β· Oct 21, 2026Source
Not verified0–2.5 / 2.5 pts
Evidence

This specific check has not been verified. Missing evidence does not mean the capability is absent. Ask for a demonstration in the proposed plan.

Not verified Β· Oct 21, 2026Source
Not verified0–2.5 / 2.5 pts
Evidence

This specific check has not been verified. Missing evidence does not mean the capability is absent. Ask for a demonstration in the proposed plan.

Not verified Β· Oct 21, 2026Source
Not verified0–2.5 / 2.5 pts
Evidence

This specific check has not been verified. Missing evidence does not mean the capability is absent. Ask for a demonstration in the proposed plan.

Not verified Β· Oct 21, 2026Source
Depth checkRegenerate recurring work after completion2.5 points Β· Demonstrate: Regenerate recurring work after completion. State the plan, limits and behaviour on failure. Use two linked projects and an overdue task.
Ask for a demonstration

Demonstrate: Regenerate recurring work after completion. State the plan, limits and behaviour on failure. Use two linked projects and an overdue task.

A scenario to run with the supplier; not a completed product test.
Supported2.5 / 2.5 pts
Evidence

Completing recurring work creates its next occurrence. Recurring tasks; comments are not copied into the next instance. Global capability evidence; local plan availability and interface language are not inferred.

Official documentation Β· Oct 21, 2026Source
Not verified0–2.5 / 2.5 pts
Evidence

This specific check has not been verified. Missing evidence does not mean the capability is absent. Ask for a demonstration in the proposed plan.

Not verified Β· Oct 21, 2026Source
Not verified0–2.5 / 2.5 pts
Evidence

This specific check has not been verified. Missing evidence does not mean the capability is absent. Ask for a demonstration in the proposed plan.

Not verified Β· Oct 21, 2026Source
Not verified0–2.5 / 2.5 pts
Evidence

This specific check has not been verified. Missing evidence does not mean the capability is absent. Ask for a demonstration in the proposed plan.

Not verified Β· Oct 21, 2026Source
Not verified0–2.5 / 2.5 pts
Evidence

This specific check has not been verified. Missing evidence does not mean the capability is absent. Ask for a demonstration in the proposed plan.

Not verified Β· Oct 21, 2026Source
Not verified0–2.5 / 2.5 pts
Evidence

This specific check has not been verified. Missing evidence does not mean the capability is absent. Ask for a demonstration in the proposed plan.

Not verified Β· Oct 21, 2026Source
Not verified0–2.5 / 2.5 pts
Evidence

This specific check has not been verified. Missing evidence does not mean the capability is absent. Ask for a demonstration in the proposed plan.

Not verified Β· Oct 21, 2026Source
Not verified0–2.5 / 2.5 pts
Evidence

This specific check has not been verified. Missing evidence does not mean the capability is absent. Ask for a demonstration in the proposed plan.

Not verified Β· Oct 21, 2026Source
Not verified0–2.5 / 2.5 pts
Evidence

This specific check has not been verified. Missing evidence does not mean the capability is absent. Ask for a demonstration in the proposed plan.

Not verified Β· Oct 21, 2026Source
Not verified0–2.5 / 2.5 pts
Evidence

This specific check has not been verified. Missing evidence does not mean the capability is absent. Ask for a demonstration in the proposed plan.

Not verified Β· Oct 21, 2026Source
Not verified0–2.5 / 2.5 pts
Evidence

This specific check has not been verified. Missing evidence does not mean the capability is absent. Ask for a demonstration in the proposed plan.

Not verified Β· Oct 21, 2026Source
Depth checkProtect public intake forms against automated spam2.5 points Β· Demonstrate: Protect public intake forms against automated spam. State the plan, limits and behaviour on failure. Use two linked projects and an overdue task.
Ask for a demonstration

Demonstrate: Protect public intake forms against automated spam. State the plan, limits and behaviour on failure. Use two linked projects and an overdue task.

A scenario to run with the supplier; not a completed product test.
Not verified0–2.5 / 2.5 pts
Evidence

This specific check has not been verified. Missing evidence does not mean the capability is absent. Ask for a demonstration in the proposed plan.

Not verified Β· Oct 21, 2026Source
Not verified0–2.5 / 2.5 pts
Evidence

This specific check has not been verified. Missing evidence does not mean the capability is absent. Ask for a demonstration in the proposed plan.

Not verified Β· Oct 21, 2026Source
Not verified0–2.5 / 2.5 pts
Evidence

This specific check has not been verified. Missing evidence does not mean the capability is absent. Ask for a demonstration in the proposed plan.

Not verified Β· Oct 21, 2026Source
Not verified0–2.5 / 2.5 pts
Evidence

This specific check has not been verified. Missing evidence does not mean the capability is absent. Ask for a demonstration in the proposed plan.

Not verified Β· Oct 21, 2026Source
Not verified0–2.5 / 2.5 pts
Evidence

This specific check has not been verified. Missing evidence does not mean the capability is absent. Ask for a demonstration in the proposed plan.

Not verified Β· Oct 21, 2026Source
Not verified0–2.5 / 2.5 pts
Evidence

This specific check has not been verified. Missing evidence does not mean the capability is absent. Ask for a demonstration in the proposed plan.

Not verified Β· Oct 21, 2026Source
Not verified0–2.5 / 2.5 pts
Evidence

This specific check has not been verified. Missing evidence does not mean the capability is absent. Ask for a demonstration in the proposed plan.

Not verified Β· Oct 21, 2026Source
Not verified0–2.5 / 2.5 pts
Evidence

This specific check has not been verified. Missing evidence does not mean the capability is absent. Ask for a demonstration in the proposed plan.

Not verified Β· Oct 21, 2026Source
Not verified0–2.5 / 2.5 pts
Evidence

This specific check has not been verified. Missing evidence does not mean the capability is absent. Ask for a demonstration in the proposed plan.

Not verified Β· Oct 21, 2026Source
Not verified0–2.5 / 2.5 pts
Evidence

This specific check has not been verified. Missing evidence does not mean the capability is absent. Ask for a demonstration in the proposed plan.

Not verified Β· Oct 21, 2026Source
Not verified0–2.5 / 2.5 pts
Evidence

This specific check has not been verified. Missing evidence does not mean the capability is absent. Ask for a demonstration in the proposed plan.

Not verified Β· Oct 21, 2026Source
Depth checkRecover accidentally deleted tasks or projects2.5 points Β· Demonstrate: Recover accidentally deleted tasks or projects. State the plan, limits and behaviour on failure. Use two linked projects and an overdue task.
Ask for a demonstration

Demonstrate: Recover accidentally deleted tasks or projects. State the plan, limits and behaviour on failure. Use two linked projects and an overdue task.

A scenario to run with the supplier; not a completed product test.
Supported2.5 / 2.5 pts
Evidence

Deleted tasks and projects have recovery workflows. Deleted-item recovery within documented retention and permissions; not permanent deletion. Global capability evidence; local plan availability and interface language are not inferred.

Official documentation Β· Oct 21, 2026Source
Not verified0–2.5 / 2.5 pts
Evidence

This specific check has not been verified. Missing evidence does not mean the capability is absent. Ask for a demonstration in the proposed plan.

Not verified Β· Oct 21, 2026Source
Not verified0–2.5 / 2.5 pts
Evidence

This specific check has not been verified. Missing evidence does not mean the capability is absent. Ask for a demonstration in the proposed plan.

Not verified Β· Oct 21, 2026Source
Not verified0–2.5 / 2.5 pts
Evidence

This specific check has not been verified. Missing evidence does not mean the capability is absent. Ask for a demonstration in the proposed plan.

Not verified Β· Oct 21, 2026Source
Not verified0–2.5 / 2.5 pts
Evidence

This specific check has not been verified. Missing evidence does not mean the capability is absent. Ask for a demonstration in the proposed plan.

Not verified Β· Oct 21, 2026Source
Not verified0–2.5 / 2.5 pts
Evidence

This specific check has not been verified. Missing evidence does not mean the capability is absent. Ask for a demonstration in the proposed plan.

Not verified Β· Oct 21, 2026Source
Not verified0–2.5 / 2.5 pts
Evidence

This specific check has not been verified. Missing evidence does not mean the capability is absent. Ask for a demonstration in the proposed plan.

Not verified Β· Oct 21, 2026Source
Not verified0–2.5 / 2.5 pts
Evidence

This specific check has not been verified. Missing evidence does not mean the capability is absent. Ask for a demonstration in the proposed plan.

Not verified Β· Oct 21, 2026Source
Not verified0–2.5 / 2.5 pts
Evidence

This specific check has not been verified. Missing evidence does not mean the capability is absent. Ask for a demonstration in the proposed plan.

Not verified Β· Oct 21, 2026Source
Not verified0–2.5 / 2.5 pts
Evidence

This specific check has not been verified. Missing evidence does not mean the capability is absent. Ask for a demonstration in the proposed plan.

Not verified Β· Oct 21, 2026Source
Not verified0–2.5 / 2.5 pts
Evidence

This specific check has not been verified. Missing evidence does not mean the capability is absent. Ask for a demonstration in the proposed plan.

Not verified Β· Oct 21, 2026Source
Depth checkCalculate task metrics with formula fields2.5 points Β· Demonstrate: Calculate task metrics with formula fields. State the plan, limits and behaviour on failure. Use two linked projects and an overdue task.
Ask for a demonstration

Demonstrate: Calculate task metrics with formula fields. State the plan, limits and behaviour on failure. Use two linked projects and an overdue task.

A scenario to run with the supplier; not a completed product test.
Supported2.5 / 2.5 pts
Evidence

Formula fields calculate values from task data. Formula custom fields; exact current plan entitlement not established. Global capability evidence; local plan availability and interface language are not inferred.

Official documentation Β· Oct 21, 2026Source
Not verified0–2.5 / 2.5 pts
Evidence

This specific check has not been verified. Missing evidence does not mean the capability is absent. Ask for a demonstration in the proposed plan.

Not verified Β· Oct 21, 2026Source
Not verified0–2.5 / 2.5 pts
Evidence

This specific check has not been verified. Missing evidence does not mean the capability is absent. Ask for a demonstration in the proposed plan.

Not verified Β· Oct 21, 2026Source
Not verified0–2.5 / 2.5 pts
Evidence

This specific check has not been verified. Missing evidence does not mean the capability is absent. Ask for a demonstration in the proposed plan.

Not verified Β· Oct 21, 2026Source
Not verified0–2.5 / 2.5 pts
Evidence

This specific check has not been verified. Missing evidence does not mean the capability is absent. Ask for a demonstration in the proposed plan.

Not verified Β· Oct 21, 2026Source
Not verified0–2.5 / 2.5 pts
Evidence

This specific check has not been verified. Missing evidence does not mean the capability is absent. Ask for a demonstration in the proposed plan.

Not verified Β· Oct 21, 2026Source
Not verified0–2.5 / 2.5 pts
Evidence

This specific check has not been verified. Missing evidence does not mean the capability is absent. Ask for a demonstration in the proposed plan.

Not verified Β· Oct 21, 2026Source
Not verified0–2.5 / 2.5 pts
Evidence

This specific check has not been verified. Missing evidence does not mean the capability is absent. Ask for a demonstration in the proposed plan.

Not verified Β· Oct 21, 2026Source
Not verified0–2.5 / 2.5 pts
Evidence

This specific check has not been verified. Missing evidence does not mean the capability is absent. Ask for a demonstration in the proposed plan.

Not verified Β· Oct 21, 2026Source
Not verified0–2.5 / 2.5 pts
Evidence

This specific check has not been verified. Missing evidence does not mean the capability is absent. Ask for a demonstration in the proposed plan.

Not verified Β· Oct 21, 2026Source
Not verified0–2.5 / 2.5 pts
Evidence

This specific check has not been verified. Missing evidence does not mean the capability is absent. Ask for a demonstration in the proposed plan.

Not verified Β· Oct 21, 2026Source
Depth checkLink dependencies between separate projects2.5 points Β· Demonstrate: Link dependencies between separate projects. State the plan, limits and behaviour on failure. Use two linked projects and an overdue task.
Ask for a demonstration

Demonstrate: Link dependencies between separate projects. State the plan, limits and behaviour on failure. Use two linked projects and an overdue task.

A scenario to run with the supplier; not a completed product test.
Not verified0–2.5 / 2.5 pts
Evidence

This specific check has not been verified. Missing evidence does not mean the capability is absent. Ask for a demonstration in the proposed plan.

Not verified Β· Oct 21, 2026Source
Not verified0–2.5 / 2.5 pts
Evidence

This specific check has not been verified. Missing evidence does not mean the capability is absent. Ask for a demonstration in the proposed plan.

Not verified Β· Oct 21, 2026Source
Not verified0–2.5 / 2.5 pts
Evidence

This specific check has not been verified. Missing evidence does not mean the capability is absent. Ask for a demonstration in the proposed plan.

Not verified Β· Oct 21, 2026Source
Not verified0–2.5 / 2.5 pts
Evidence

This specific check has not been verified. Missing evidence does not mean the capability is absent. Ask for a demonstration in the proposed plan.

Not verified Β· Oct 21, 2026Source
Not verified0–2.5 / 2.5 pts
Evidence

This specific check has not been verified. Missing evidence does not mean the capability is absent. Ask for a demonstration in the proposed plan.

Not verified Β· Oct 21, 2026Source
Not verified0–2.5 / 2.5 pts
Evidence

This specific check has not been verified. Missing evidence does not mean the capability is absent. Ask for a demonstration in the proposed plan.

Not verified Β· Oct 21, 2026Source
Not verified0–2.5 / 2.5 pts
Evidence

This specific check has not been verified. Missing evidence does not mean the capability is absent. Ask for a demonstration in the proposed plan.

Not verified Β· Oct 21, 2026Source
Not verified0–2.5 / 2.5 pts
Evidence

This specific check has not been verified. Missing evidence does not mean the capability is absent. Ask for a demonstration in the proposed plan.

Not verified Β· Oct 21, 2026Source
Not verified0–2.5 / 2.5 pts
Evidence

This specific check has not been verified. Missing evidence does not mean the capability is absent. Ask for a demonstration in the proposed plan.

Not verified Β· Oct 21, 2026Source
Not verified0–2.5 / 2.5 pts
Evidence

This specific check has not been verified. Missing evidence does not mean the capability is absent. Ask for a demonstration in the proposed plan.

Not verified Β· Oct 21, 2026Source
Not verified0–2.5 / 2.5 pts
Evidence

This specific check has not been verified. Missing evidence does not mean the capability is absent. Ask for a demonstration in the proposed plan.

Not verified Β· Oct 21, 2026Source
Depth checkDelegate an absent project approver's decisions2.5 points Β· Demonstrate: Delegate an absent project approver's decisions. State the plan, limits and behaviour on failure. Use two linked projects and an overdue task.
Ask for a demonstration

Demonstrate: Delegate an absent project approver's decisions. State the plan, limits and behaviour on failure. Use two linked projects and an overdue task.

A scenario to run with the supplier; not a completed product test.
Not verified0–2.5 / 2.5 pts
Evidence

This specific check has not been verified. Missing evidence does not mean the capability is absent. Ask for a demonstration in the proposed plan.

Not verified Β· Oct 21, 2026Source
Not verified0–2.5 / 2.5 pts
Evidence

This specific check has not been verified. Missing evidence does not mean the capability is absent. Ask for a demonstration in the proposed plan.

Not verified Β· Oct 21, 2026Source
Not verified0–2.5 / 2.5 pts
Evidence

This specific check has not been verified. Missing evidence does not mean the capability is absent. Ask for a demonstration in the proposed plan.

Not verified Β· Oct 21, 2026Source
Not verified0–2.5 / 2.5 pts
Evidence

This specific check has not been verified. Missing evidence does not mean the capability is absent. Ask for a demonstration in the proposed plan.

Not verified Β· Oct 21, 2026Source
Not verified0–2.5 / 2.5 pts
Evidence

This specific check has not been verified. Missing evidence does not mean the capability is absent. Ask for a demonstration in the proposed plan.

Not verified Β· Oct 21, 2026Source
Not verified0–2.5 / 2.5 pts
Evidence

This specific check has not been verified. Missing evidence does not mean the capability is absent. Ask for a demonstration in the proposed plan.

Not verified Β· Oct 21, 2026Source
Not verified0–2.5 / 2.5 pts
Evidence

This specific check has not been verified. Missing evidence does not mean the capability is absent. Ask for a demonstration in the proposed plan.

Not verified Β· Oct 21, 2026Source
Not verified0–2.5 / 2.5 pts
Evidence

This specific check has not been verified. Missing evidence does not mean the capability is absent. Ask for a demonstration in the proposed plan.

Not verified Β· Oct 21, 2026Source
Not verified0–2.5 / 2.5 pts
Evidence

This specific check has not been verified. Missing evidence does not mean the capability is absent. Ask for a demonstration in the proposed plan.

Not verified Β· Oct 21, 2026Source
Not verified0–2.5 / 2.5 pts
Evidence

This specific check has not been verified. Missing evidence does not mean the capability is absent. Ask for a demonstration in the proposed plan.

Not verified Β· Oct 21, 2026Source
Not verified0–2.5 / 2.5 pts
Evidence

This specific check has not been verified. Missing evidence does not mean the capability is absent. Ask for a demonstration in the proposed plan.

Not verified Β· Oct 21, 2026Source

WHAT WE MEASURE

The criteria behind the score.

The established 20 checks contribute 80 points. Eight new operational checks contribute 20 points. AI checks are included in their own group and are excluded when AI priority is set to zero. These assess documented capability scope, not measured performance. Adjust group priorities in the comparison tool.

See the complete calculation β†’
  1. Planning & dependencies 20%

    Plans need ownership and realistic dependencies.

  2. Team collaboration 20%

    Discussion and documents should stay attached to work.

  3. Workflow automation 16%

    Repeatable routing reduces manual coordination.

  4. Portfolio & capacity 12%

    Cross-project visibility matters as work scales.

  5. AI work assistance 12%

    Useful AI should operate on relevant work with clear limits.

  6. Operational detail 20%

    Specific workflow, integration and control checks beyond the established rubric.

THE PRACTICAL BUYER’S GUIDE

How to choose project management.

Project software becomes useful when it clarifies ownership, dependencies, and decisions. A small team coordinating a few deliverables needs a different system from a services company allocating people across dozens of client projects. Start with the unit of work you manage: a task, a recurring request, a campaign, a project, or a portfolio. Then identify where discussions, documents, approvals, and status reporting should live. A rich platform can support several styles, but it still needs shared conventions. Our comparison separates planning, collaboration, automation, portfolio visibility, and AI so a writing assistant cannot substitute for the operational capabilities your team needs.

Pilot an actual project, not an empty template

Choose a recent project with a deadline change, external collaborator, approval, and blocked task. Recreate it in each finalist, then ask team members to update their own work without a specialist guiding every click. Check whether a dependency change reaches the relevant owner and whether stakeholders can understand status without editing the plan. Capture the setup effort as well as the result. The best fit is not necessarily the product with the most views; it is the one your team can maintain consistently. Decide which existing tools it will replace and which it must keep connected before estimating savings.

Model seats, guests, automation, and growth

Count editors, administrators, occasional contributors, and external guests separately. Ask which actions convert a collaborator into a paid seat and how seat additions are billed. Then size automation runs, attachment storage, cross-project reporting, and portfolio capacity. A free plan may suit a personal project while an organization's approval or identity requirements trigger a different tier. Compare annual and monthly commitments on the same basis, and include implementation time for templates and integrations. For growing teams, test the next operating stage as well: a platform that works for one department may need stronger ownership rules when five departments share it.

Give AI a measurable job

Evaluate AI against a specific task: summarize overdue work with sources, draft a project brief from approved information, triage incoming requests, or prepare a status update. Check whether it can actually update work or only produce text. Ask who reviews actions and how permissions apply across connected apps. Separate conversational AI access from automated agent credits, meeting transcription allowances, and workflow action limits. Those units are not interchangeable. In a pilot, compare the AI output with the underlying tasks and record the corrections required. A persuasive summary is useful only if the owners, dates, dependencies, and decisions are accurate.

What changes the total cost?

  • Paid members, guest conversion rules, seat minimums, and billing term.
  • Portfolio, resource, integration, and enterprise identity features.
  • AI credits, meeting allowances, workflow actions, and template setup.

Where purchases go wrong

  • Choosing by number of views rather than the team's actual delivery workflow.
  • Ignoring occasional collaborators who become billable members.
  • Treating included AI trials as unlimited ongoing production usage.

Bring these questions to the demo

  • Show what happens when a dependent task slips by a week.
  • Which actions make a guest or contributor billable?
  • Can a manager see capacity across every relevant project?
  • Show the sources and credit usage for an AI-generated status update.

Questions buyers ask

Do we need a portfolio tool for a small team?

Only if decisions span multiple projects. A simple shared plan may be enough until capacity and dependencies cross team boundaries.

Can a document workspace manage projects?

It can, especially for knowledge-centered work. Test dependencies, reporting, and resource allocation rather than assuming a database view provides them all.

Does AI change the comparison score?

Yes, documented AI contributes 15% of the default feature-fit model. The other 85% reflects the category's operating needs.

Research sources

  1. Asana pricing and capability tiers
  2. monday AI pricing model
  3. Smartsheet plans