Core capabilityTasks and structured workOrganize project tasks or work items in a plan. 4 points maximum | Supported4 / 4 pts Projects and configured workflows organize work. Official documentation Β· Oct 15, 2026Source β |
|---|
Core capabilityTimeline or dependency planningPlan dates or dependencies in timeline, Gantt or dependency views. 4 points maximum | Not verified0β4 / 4 pts The reviewed documentation does not establish timeline or dependency planning at this feature level. This is an evidence gap, not a finding that the capability is absent. Not verified Β· Oct 15, 2026Source β |
|---|
Depth checkDependency-aware reschedulingMove linked task dates or identify downstream impact when a predecessor changes. 5.6 points maximumAsk for a demonstrationDelay a predecessor and show which dependent dates or warnings change. A scenario to run with the supplier; not a completed product test. | Supported5.6 / 5.6 pts Dependent tasks reschedule with predecessors; approvals record approve/change-request decisions in the work review flow. Official documentation Β· Oct 15, 2026Source β |
|---|
Depth checkBaseline or planned-versus-actual trackingCompare a saved or planned schedule with current progress or actual dates. 6.4 points maximumAsk for a demonstrationSave a plan, change delivery dates and show the variance from the original plan. A scenario to run with the supplier; not a completed product test. | Supported6.4 / 6.4 pts Wrike's January 2026 release documents Gantt snapshots and baselines for comparing schedule states. Official documentation Β· Oct 15, 2026Source β |
|---|
Core capabilityDiscussion attached to workDiscuss work through comments, updates or project chat. 4 points maximum | Supported4 / 4 pts Shared work supports team collaboration. Official documentation Β· Oct 15, 2026Source β |
|---|
Core capabilityShared documents or reviewCollaborate on documents, attachments or reviewable work within a project. 4 points maximum | Supported4 / 4 pts Review workflows support collaboration on deliverables. Official documentation Β· Oct 15, 2026Source β |
|---|
Depth checkWork or document version historyInspect prior task/document values or restore an earlier version. 5.6 points maximumAsk for a demonstrationChange shared project content and show the previous version and restoration options. A scenario to run with the supplier; not a completed product test. | Supported5.6 / 5.6 pts Description version history lets users inspect prior versions and restore selected content. Official documentation Β· Oct 15, 2026Source β |
|---|
Depth checkScoped external-collaborator accessLimit an external collaborator to selected work while protecting unrelated project information. 6.4 points maximumAsk for a demonstrationInvite a test guest to one project and show that another project remains inaccessible. A scenario to run with the supplier; not a completed product test. | Supported6.4 / 6.4 pts Guest reviewers see only files assigned for approval, with controls for download, internal comments and access expiry; they cannot browse other project data. Official documentation Β· Oct 15, 2026Source β |
|---|
Core capabilityTriggered workflow automationRun configured steps when a task or project event occurs. 3.2 points maximum | Supported3.2 / 3.2 pts Configurable workflow automation is documented. Official documentation Β· Oct 15, 2026Source β |
|---|
Core capabilityAutomated routing or approvalsAutomatically route work, assign it or initiate a review/approval. 3.2 points maximum | Supported3.2 / 3.2 pts Agents can route work and initiate approvals. Official documentation Β· Oct 15, 2026Source β |
|---|
Depth checkMultiple-condition workflow rulesCombine conditions before a workflow changes or routes work. 4.8 points maximumAsk for a demonstrationCreate a rule for an overdue high-priority item and show that a low-priority item does not trigger it. A scenario to run with the supplier; not a completed product test. | Supported4.8 / 4.8 pts Automation condition filters combine status, assignee, effort and custom-field requirements before actions run. Official documentation Β· Oct 15, 2026Source β |
|---|
Depth checkApproval outcomes in the workflowCapture approval/rejection or requested changes and use that result to advance or reroute work. 4.8 points maximumAsk for a demonstrationReject an approval request and show the item returning to its owner with the decision recorded. A scenario to run with the supplier; not a completed product test. | Supported4.8 / 4.8 pts Dependent tasks reschedule with predecessors; approvals record approve/change-request decisions in the work review flow. Official documentation Β· Oct 15, 2026Source β |
|---|
Core capabilityCross-project portfolio visibilitySee or report across multiple projects in one view. 2.4 points maximum | Supported2.4 / 2.4 pts Portfolio features require advanced tiers. Official documentation Β· Oct 15, 2026Source β |
|---|
Core capabilityResource or workload planningReview or allocate team capacity across work. 2.4 points maximum | Supported2.4 / 2.4 pts Advanced resource planning is tier-dependent. Official documentation Β· Oct 15, 2026Source β |
|---|
Depth checkCapacity and overload visibilityCompare allocated work with individual or team capacity and identify overload. 3.2 points maximumAsk for a demonstrationOver-allocate a person across two projects and show where the conflict appears. A scenario to run with the supplier; not a completed product test. | Supported3.2 / 3.2 pts Professional Services supports task-to-project custom-field rollups and workload charts across projects, with overload visibility and redistribution of assigned effort. Official documentation Β· Oct 15, 2026Source β |
|---|
Depth checkPortfolio progress or metric rollupsAggregate progress, dates or configured measures from multiple projects into a portfolio report. 4 points maximumAsk for a demonstrationChange a project measure and show the corresponding portfolio total or status update. A scenario to run with the supplier; not a completed product test. | Supported4 / 4 pts Professional Services supports task-to-project custom-field rollups and workload charts across projects, with overload visibility and redistribution of assigned effort. Official documentation Β· Oct 15, 2026Source β |
|---|
Core capabilityAI work summaries or contentGenerate or summarize content using work or project context. 2.4 points maximum | Not verified0β2.4 / 2.4 pts The reviewed documentation does not establish ai work summaries or content at this feature level. This is an evidence gap, not a finding that the capability is absent. Not verified Β· Oct 15, 2026Source β |
|---|
Core capabilityAI-driven work actionsUse AI to classify, update, route or execute steps on work items. 2.4 points maximum | Supported2.4 / 2.4 pts AI agents classify, route and start approvals; Business/Pinnacle/Apex and administrator enablement apply. Official documentation Β· Oct 15, 2026Source β |
|---|
Depth checkAI respects work-access boundariesDocument that AI uses only work the requester or configured agent can access. 3.2 points maximumAsk for a demonstrationAsk AI about a restricted project as a guest and show the boundary. A scenario to run with the supplier; not a completed product test. | Supported3.2 / 3.2 pts AI agents run within configured locations and allowed actions, with per-action filters and administrator-controlled scope. Review these permissions before enabling an agent. Official documentation Β· Oct 15, 2026Source β |
|---|
Depth checkReview or scope AI work-changing actionsRequire approval or explicitly configure which work-changing actions an AI assistant/agent may perform. 4 points maximumAsk for a demonstrationAsk AI to update a task and show the review step or configured action permissions. A scenario to run with the supplier; not a completed product test. | Supported4 / 4 pts AI agents run within configured locations and allowed actions, with per-action filters and administrator-controlled scope. Review these permissions before enabling an agent. Official documentation Β· Oct 15, 2026Source β |
|---|
Depth checkKeep one task synchronised across multiple projectsDemonstrate: Keep one task synchronised across multiple projects. State the plan, limits and behaviour on failure. Use two linked projects and an overdue task. 2.5 points maximumAsk for a demonstrationDemonstrate: Keep one task synchronised across multiple projects. State the plan, limits and behaviour on failure. Use two linked projects and an overdue task. A scenario to run with the supplier; not a completed product test. | Not verified0β2.5 / 2.5 pts This specific check has not been verified. Missing evidence does not mean the capability is absent. Ask for a demonstration in the proposed plan. Not verified Β· Oct 21, 2026Source β |
|---|
Depth checkIdentify the project's critical pathDemonstrate: Identify the project's critical path. State the plan, limits and behaviour on failure. Use two linked projects and an overdue task. 2.5 points maximumAsk for a demonstrationDemonstrate: Identify the project's critical path. State the plan, limits and behaviour on failure. Use two linked projects and an overdue task. A scenario to run with the supplier; not a completed product test. | Not verified0β2.5 / 2.5 pts This specific check has not been verified. Missing evidence does not mean the capability is absent. Ask for a demonstration in the proposed plan. Not verified Β· Oct 21, 2026Source β |
|---|
Depth checkRegenerate recurring work after completionDemonstrate: Regenerate recurring work after completion. State the plan, limits and behaviour on failure. Use two linked projects and an overdue task. 2.5 points maximumAsk for a demonstrationDemonstrate: Regenerate recurring work after completion. State the plan, limits and behaviour on failure. Use two linked projects and an overdue task. A scenario to run with the supplier; not a completed product test. | Not verified0β2.5 / 2.5 pts This specific check has not been verified. Missing evidence does not mean the capability is absent. Ask for a demonstration in the proposed plan. Not verified Β· Oct 21, 2026Source β |
|---|
Depth checkProtect public intake forms against automated spamDemonstrate: Protect public intake forms against automated spam. State the plan, limits and behaviour on failure. Use two linked projects and an overdue task. 2.5 points maximumAsk for a demonstrationDemonstrate: Protect public intake forms against automated spam. State the plan, limits and behaviour on failure. Use two linked projects and an overdue task. A scenario to run with the supplier; not a completed product test. | Not verified0β2.5 / 2.5 pts This specific check has not been verified. Missing evidence does not mean the capability is absent. Ask for a demonstration in the proposed plan. Not verified Β· Oct 21, 2026Source β |
|---|
Depth checkRecover accidentally deleted tasks or projectsDemonstrate: Recover accidentally deleted tasks or projects. State the plan, limits and behaviour on failure. Use two linked projects and an overdue task. 2.5 points maximumAsk for a demonstrationDemonstrate: Recover accidentally deleted tasks or projects. State the plan, limits and behaviour on failure. Use two linked projects and an overdue task. A scenario to run with the supplier; not a completed product test. | Not verified0β2.5 / 2.5 pts This specific check has not been verified. Missing evidence does not mean the capability is absent. Ask for a demonstration in the proposed plan. Not verified Β· Oct 21, 2026Source β |
|---|
Depth checkCalculate task metrics with formula fieldsDemonstrate: Calculate task metrics with formula fields. State the plan, limits and behaviour on failure. Use two linked projects and an overdue task. 2.5 points maximumAsk for a demonstrationDemonstrate: Calculate task metrics with formula fields. State the plan, limits and behaviour on failure. Use two linked projects and an overdue task. A scenario to run with the supplier; not a completed product test. | Not verified0β2.5 / 2.5 pts This specific check has not been verified. Missing evidence does not mean the capability is absent. Ask for a demonstration in the proposed plan. Not verified Β· Oct 21, 2026Source β |
|---|
Depth checkLink dependencies between separate projectsDemonstrate: Link dependencies between separate projects. State the plan, limits and behaviour on failure. Use two linked projects and an overdue task. 2.5 points maximumAsk for a demonstrationDemonstrate: Link dependencies between separate projects. State the plan, limits and behaviour on failure. Use two linked projects and an overdue task. A scenario to run with the supplier; not a completed product test. | Not verified0β2.5 / 2.5 pts This specific check has not been verified. Missing evidence does not mean the capability is absent. Ask for a demonstration in the proposed plan. Not verified Β· Oct 21, 2026Source β |
|---|
Depth checkDelegate an absent project approver's decisionsDemonstrate: Delegate an absent project approver's decisions. State the plan, limits and behaviour on failure. Use two linked projects and an overdue task. 2.5 points maximumAsk for a demonstrationDemonstrate: Delegate an absent project approver's decisions. State the plan, limits and behaviour on failure. Use two linked projects and an overdue task. A scenario to run with the supplier; not a completed product test. | Not verified0β2.5 / 2.5 pts This specific check has not been verified. Missing evidence does not mean the capability is absent. Ask for a demonstration in the proposed plan. Not verified Β· Oct 21, 2026Source β |
|---|